Free online assessment

Assess your Electrical safety and trade knowledge skills for free

Independent knowledge assessment with a personalized learning plan; it may support preparation for further training or certification but is not an official exam.

This assessment measures knowledge and produces a practical diagnostic. Recommended modules are learning suggestions, not paid courses.

What is assessed

Questions about practical workplace skills

The assessment covers various knowledge topics with beginner, intermediate and advanced questions. Your score and topic breakdown highlight areas for review.

This is not a certification, qualification or official driver exam. For driving, always follow official provincial rules and requirements.

Who can use it

Employees, learners and skills managers

  • Employees and applicants.
  • HR professionals.
  • Employers, managers and team leads.
Assessment learning framework

Modules that may appear in your recommended plan

The topics below form the recommendation framework associated with this assessment. The system selects priorities using individual answers and proposes a plan to use independently with a provider of your choice. We do not deliver these courses through this website.

01
Topic M01

Work on an electrical panel

3-hour workshop: work on an electrical panel; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to work on an electrical panel.
  • Explain why the correct action is to assess hazards and prioritize de-energized work.
  • Apply this approach correctly: follow energy isolation and lockout procedures.
  • Diagnose a common error involving a distribution board to lock.
  • Verify results and justify the action: follow energy isolation and lockout procedures.
3 h
02
Topic M02

A circuit to troubleshoot

3-hour workshop: a circuit to troubleshoot; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a circuit to troubleshoot.
  • Explain why the correct action is to confirm identification before operating it.
  • Apply this approach correctly: check grounding and mechanical cable protection.
  • Diagnose a common error involving temporarily connected equipment.
  • Verify results and justify the action: check grounding and mechanical cable protection.
3 h
03
Topic M03

Verifying absence of voltage

3-hour workshop: verifying absence of voltage; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to verifying absence of voltage.
  • Explain why the correct action is to use suitable test equipment and verification procedures.
  • Apply this approach correctly: consult the applicable code and authority.
  • Diagnose a common error involving an electrical installation to inspect.
  • Verify results and justify the action: consult the applicable code and authority.
3 h
04
Topic M04

A tripped protective device

3-hour workshop: a tripped protective device; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a tripped protective device.
  • Explain why the correct action is to investigate the cause before resetting.
  • Apply this approach correctly: have a qualified person validate load calculations and protection.
  • Diagnose a common error involving a capacity change.
  • Verify results and justify the action: have a qualified person validate load calculations and protection.
3 h
05
Topic M05

An exposed conductor

3-hour workshop: an exposed conductor; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an exposed conductor.
  • Explain why the correct action is to prevent access and have the circuit isolated.
  • Apply this approach correctly: inspect the system and notify affected personnel.
  • Diagnose a common error involving re-energization after work.
  • Verify results and justify the action: inspect the system and notify affected personnel.
3 h
06
Topic M06

Checking grounding

3-hour workshop: checking grounding; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to checking grounding.
  • Explain why the correct action is to check continuity using the applicable approved method.
  • Apply this approach correctly: check continuity using the applicable approved method.
  • Diagnose a common error involving checking grounding.
  • Verify results and justify the action: check continuity using the applicable approved method.
3 h
07
Topic M07

Selecting a circuit breaker

3-hour workshop: selecting a circuit breaker; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to selecting a circuit breaker.
  • Explain why the correct action is to coordinate protection with the circuit and load.
  • Apply this approach correctly: coordinate protection with the circuit and load.
  • Diagnose a common error involving selecting a circuit breaker.
  • Verify results and justify the action: coordinate protection with the circuit and load.
3 h
08
Topic M08

An overloaded circuit

3-hour workshop: an overloaded circuit; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an overloaded circuit.
  • Explain why the correct action is to redistribute load and correct the cause.
  • Apply this approach correctly: redistribute load and correct the cause.
  • Diagnose a common error involving an overloaded circuit.
  • Verify results and justify the action: redistribute load and correct the cause.
3 h
09
Topic M09

A damaged extension cord

3-hour workshop: a damaged extension cord; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a damaged extension cord.
  • Explain why the correct action is to remove the cord from service immediately.
  • Apply this approach correctly: remove the cord from service immediately.
  • Diagnose a common error involving a damaged extension cord.
  • Verify results and justify the action: remove the cord from service immediately.
3 h
10
Topic M10

Work near overhead electrical lines

3-hour workshop: work near overhead electrical lines; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to work near overhead electrical lines.
  • Explain why the correct action is to maintain required clearance and seek specialized coordination.
  • Apply this approach correctly: maintain required clearance and seek specialized coordination.
  • Diagnose a common error involving work near overhead electrical lines.
  • Verify results and justify the action: maintain required clearance and seek specialized coordination.
3 h
11
Topic M11

An energized cabinet

3-hour workshop: an energized cabinet; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an energized cabinet.
  • Explain why the correct action is to restrict access to qualified persons and apply controls.
  • Apply this approach correctly: restrict access to qualified persons and apply controls.
  • Diagnose a common error involving an energized cabinet.
  • Verify results and justify the action: restrict access to qualified persons and apply controls.
3 h
12
Topic M12

An arc-flash risk

3-hour workshop: an arc-flash risk; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an arc-flash risk.
  • Explain why the correct action is to assess incident energy and controls before work.
  • Apply this approach correctly: assess incident energy and controls before work.
  • Diagnose a common error involving an arc-flash risk.
  • Verify results and justify the action: assess incident energy and controls before work.
3 h
13
Topic M13

An outdated electrical drawing

3-hour workshop: an outdated electrical drawing; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an outdated electrical drawing.
  • Explain why the correct action is to confirm actual wiring and update the drawing.
  • Apply this approach correctly: confirm actual wiring and update the drawing.
  • Diagnose a common error involving an outdated electrical drawing.
  • Verify results and justify the action: confirm actual wiring and update the drawing.
3 h
14
Topic M14

A resistance measurement

3-hour workshop: a resistance measurement; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a resistance measurement.
  • Explain why the correct action is to de-energize the circuit before suitable testing.
  • Apply this approach correctly: de-energize the circuit before suitable testing.
  • Diagnose a common error involving a resistance measurement.
  • Verify results and justify the action: de-energize the circuit before suitable testing.
3 h
15
Topic M15

An insulation fault

3-hour workshop: an insulation fault; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an insulation fault.
  • Explain why the correct action is to have a qualified professional diagnose and fix it.
  • Apply this approach correctly: have a qualified professional diagnose and fix it.
  • Diagnose a common error involving an insulation fault.
  • Verify results and justify the action: have a qualified professional diagnose and fix it.
3 h
16
Topic M16

A wet electrical environment

3-hour workshop: a wet electrical environment; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a wet electrical environment.
  • Explain why the correct action is to use equipment and protection suited to moisture.
  • Apply this approach correctly: use equipment and protection suited to moisture.
  • Diagnose a common error involving a wet electrical environment.
  • Verify results and justify the action: use equipment and protection suited to moisture.
3 h
17
Topic M17

A test instrument to inspect

3-hour workshop: a test instrument to inspect; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a test instrument to inspect.
  • Explain why the correct action is to check condition, rating and leads before use.
  • Apply this approach correctly: check condition, rating and leads before use.
  • Diagnose a common error involving a test instrument to inspect.
  • Verify results and justify the action: check condition, rating and leads before use.
3 h
18
Topic M18

A three-phase system

3-hour workshop: a three-phase system; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a three-phase system.
  • Explain why the correct action is to identify phases and follow safe working procedures.
  • Apply this approach correctly: identify phases and follow safe working procedures.
  • Diagnose a common error involving a three-phase system.
  • Verify results and justify the action: identify phases and follow safe working procedures.
3 h
19
Topic M19

An overheating receptacle

3-hour workshop: an overheating receptacle; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to an overheating receptacle.
  • Explain why the correct action is to take it out of service and correct the connection.
  • Apply this approach correctly: take it out of service and correct the connection.
  • Diagnose a common error involving an overheating receptacle.
  • Verify results and justify the action: take it out of service and correct the connection.
3 h
20
Topic M20

A ground-fault protection device

3-hour workshop: a ground-fault protection device; scenarios, guided practice and knowledge checks.

  • Identify risks and prerequisites related to a ground-fault protection device.
  • Explain why the correct action is to verify suitability and test per instructions.
  • Apply this approach correctly: verify suitability and test per instructions.
  • Diagnose a common error involving a ground-fault protection device.
  • Verify results and justify the action: verify suitability and test per instructions.
3 h
Assessment output

Actionable insight, not a sales pitch

The report provides an overall score, category breakdown and recommended modules. Use it to inform development discussions, document progress or complement candidate assessment.

View business use cases →

Privacy and recipients

The participant provides their email and that of the manager or authorized report recipient. The tool emails the report to those recipients according to its current process. Do not enter a third party without permission.

Review privacy information
Free assessment

Ready to assess your Electrical safety and trade knowledge skills?

45 questions and a suggested development plan. No course enrollment.

Take the free test